Events and shows
Click here for all events

Member of the Diesekogroup

Worldwide projects Worldwide projects
Newsletter
Sign up
International Construction Equipment
Dieseko Group B.V.
Lelystraat 49
3364 AH Sliedrecht
Netherlands
T: +31 (0)184 410333
E: info@ice-holland.com

Home | Projects › Construction of a dry dock for shipyard São Miguel in São Gonçalo-RdJ-Brasil

Construction of a dry dock for shipyard São Miguel in São Gonçalo-RdJ-Brasil

Country Brazil
Date July 2011
Description   extension of terminal
Machines ICE 416L with 400 power pack

A Brasilian shipyard is doubling their capacity by creating another dry dock. The perimeter of the dry dock is protected by a wall of sheet piles. Two ICE vibratory hammers are working on this jobsite. The foundation conducted by ESCOPO Engineering consists of a total of 440 piles, the majority of piles with a length of 11.80 m long were driven by an ICE vibratory hammer 416 L with 400 a Power Pack. Some 60 piles with a length of 6 m long were driven by the ICE vibratory hammer 428 B connected to a hydraulic excavator CASE CX 220. The hammers were rented out by Maquina Solo, located in Cotia-Sao Paulo. For more info check out their website: http://www.maquinasolo.com.br



Share this page:
© 2020 ICE - International Construction Equipment
Webdesign & Development: HPU internet services