X close
Member of the Diesekogroup

Worldwide projects Worldwide projects
Newsletter
International Construction Equipment
Dieseko Group B.V.
Lelystraat 49
3364 AH Sliedrecht
Netherlands
T: +31 (0)184 410333
E: info@ice-holland.com

Home | Projects › Construction of a dry dock for shipyard São Miguel in São Gonçalo-RdJ-Brasil

Construction of a dry dock for shipyard São Miguel in São Gonçalo-RdJ-Brasil

Country Brazil
Date July 2011
Description   extension of terminal
Machines ICE 416L with 400 power pack

A Brasilian shipyard is doubling their capacity by creating another dry dock. The perimeter of the dry dock is protected by a wall of sheet piles. Two ICE vibratory hammers are working on this jobsite. The foundation conducted by ESCOPO Engineering consists of a total of 440 piles, the majority of piles with a length of 11.80 m long were driven by an ICE vibratory hammer 416 L with 400 a Power Pack. Some 60 piles with a length of 6 m long were driven by the ICE vibratory hammer 428 B connected to a hydraulic excavator CASE CX 220. The hammers were rented out by Maquina Solo, located in Cotia-Sao Paulo. For more info check out their website: http://www.maquinasolo.com.br



Share this page:
© 2019 ICE - International Construction Equipment
Webdesign & Development: HPU internet services